Graybar project
Back to Projects

Graybar

Seattle, WashingtonCompleted October 2021Consulting and PT Repair

Post Tensioning Solutions investigated and repaired the existing button head post-tensioning system. This building lacked the concrete coverage needed to adequately cover the shims and stressing washers.

Project Overview

The Graybar project showcases our expertise in investigating and repairing existing post-tensioning systems. The building had an existing button head post-tensioning system that lacked adequate concrete coverage to protect the shims and stressing washers, leading to corrosion issues.

Technical Approach

Our comprehensive repair strategy included:

  • Thorough investigation of the existing PT system
  • Sand blasting and cleaning of all anchors to remove rust and corrosion
  • Galvanization and waterproofing of the anchors
  • Application of additional 3" of concrete for future protection

Challenges & Solutions

Despite considerable corrosion, we determined that the system was still structurally sound and did not need to be replaced. This saved the client significant time and expense while still ensuring the long-term integrity of the structure.

  • Addressing corrosion without full system replacement
  • Ensuring proper cleaning and preparation of corroded components
  • Implementing effective waterproofing measures
  • Adding sufficient concrete coverage for long-term protection
Graybar - Concrete Spalling
1 / 4

Key Highlights

Corrosion Mitigation

Successfully addressed significant corrosion while maintaining the integrity of the existing PT system.

Comprehensive Restoration

Thorough cleaning, galvanization, and waterproofing of all anchors to prevent future deterioration.

Long-Term Protection

Added 3 inches of concrete coverage to ensure lasting protection of the PT system components.

Technical Excellence

Our approach combined thorough investigation with specialized repair techniques to ensure the longevity of the post-tensioning system.

Specialized Capabilities

  • Expert assessment of PT system integrity
  • Advanced corrosion mitigation techniques
  • Comprehensive waterproofing and protection systems

Project Results

System Preservation

Successfully preserved the existing PT system, avoiding costly full replacement while ensuring structural integrity.

Enhanced Protection

Implemented multiple layers of protection including galvanization, waterproofing, and additional concrete coverage.

Long-Term Durability

Extended the service life of the building's structural system with comprehensive repair and protection measures.

Need PT Repair Services?

Contact our expert team to discuss your post-tensioning repair needs and discover how our specialized approach can extend the life of your structure.