MLK Townhomes project
Back to Projects

MLK Townhomes

Seattle, WashingtonCompleted June 2015Fortis Pile

Urban residential development showcasing our innovative Fortis Pile shoring system, featuring 25 specialized beams that eliminated the need for easements while maximizing buildable space. This project demonstrates how our patented technology transforms residential construction in tight urban environments.

Project Overview

The MLK Townhomes project showcases how our Fortis Pile system revolutionizes residential construction in urban environments. With challenging site conditions including limited construction footprint and proximity to neighboring properties, our solution provided a self-contained system that maximized buildable area while streamlining the construction process.

Technical Approach

Our implementation strategy focused on:

  • Strategic placement of 25 specialized Fortis Pile beams
  • Comprehensive site analysis and property line verification
  • Methodical beam installation with continuous quality monitoring
  • Efficient equipment staging and access route planning

Traditional vs. Fortis Pile

Traditional Challenges

  • Restricted space for conventional shoring
  • Complex neighbor easement requirements
  • Extended construction timeline
  • Higher installation costs

Fortis Pile Advantages

  • Zero easement requirements
  • Streamlined installation process
  • Reduced equipment needs
  • Minimal site impact
MLK Townhomes - Primary View
1 / 4

Key Highlights

Zero Easement Requirements

Self-supporting cantilever system eliminated the need for neighbor agreements and maximized buildable area.

Efficient Installation

25 Fortis Pile beams installed with minimal equipment needs and streamlined coordination.

Cost-Effective Solution

Reduced labor, equipment, and timeline requirements while maximizing site utilization.

Results & Benefits

The MLK Townhomes project achieved significant improvements in construction efficiency and site utilization through our innovative Fortis Pile system.

Performance Metrics

  • Full site utilization with zero easement requirements
  • Accelerated timeline through efficient beam installation
  • Incident-free installation with enhanced site security
  • Significant cost savings through reduced labor and equipment needs

Need Innovative Shoring Solutions?

Contact our team to learn how our Fortis Pile system can maximize your project's efficiency and minimize complications with neighboring properties.